Extending burner pipe service life starts with a lining design suited to its operating conditions. At a cement plant in Texas, SILICON combined SpeedCell® and SpeedBolt® mini in a zone-specific anchoring design aimed at keeping the burner tip in service from one planned turnaround to the next.
Download the case study to explore the approach and installation.