News
October 28th, 2026

Download the Case Study: A Different Approach To Burner Pipe Linings

Extending burner pipe service life starts with a lining design suited to its operating conditions. At a cement plant in Texas, SILICON combined SpeedCell® and SpeedBolt® mini in a zone-specific anchoring design aimed at keeping the burner tip in service from one planned turnaround to the next.

Download the case study to explore the approach and installation.

You might also be interested in

Share this article