Petrochem, The UAE, June/July 2022

We are immensely proud of the results we have achieved. This project is yet another standout achievement for SILICON.

In the summer of 2022, an expert team of 25 RAW crew members embarked on a critical mission to the United Arab Emirates. Their task? To execute an urgent 100-square-meter repair at the world’s fourth-largest oil refinery, home to the most extensive RFCCU unit globally.

A leading world energy producer partnered with us for this emergency because of our successful performance earlier in that year.

Scope of work

The refinery’s units suffered heavy refractory spalling and damage due to the failure of the hex mesh application. To restore the units to full capacity, SpeedHex® 3 was chosen as it is the only solution that can be installed in the blink of an eye.

“In my experience, SpeedHex® 3 has changed the game significantly for the petrochemical industry. We can bring any unit back up and running as quickly as possible. This would not have been possible with traditional methods. The flexibility of this anchor and the rest of the SILICON equipment makes it the perfect system.”

Corwin DeSimone, RAW Specialist

In just 11 days, our team installed 89,500 SpeedHex® 3 anchors, ensuring the repair units were operational on time. SpeedHex® 3, along with SpeedHex® Mini and SpeedTab®, were the heroes of this project, performing tasks beyond the capabilities of other solutions.

To manage the installation of this many anchors, 10 D20 machines were dispatched. The installation crew consisted of 1 RAW Project Manager, 1 RAW Senior Supervisor, 5 RAW Operating Supervisors, 16 RAW Operators, and 2 Project Administrators.

This dedicated team exemplifies the refinery’s commitment to maximizing the value of energy resources through innovation, efficiency, and an unwavering focus on high performance. These are the values that SILICON upholds as well, as we are committed to delivering reliable, high-quality products and services.

Emergency experts

Your emergency is our specialty. Urgent repair does not intimidate us; it drives us to excel.

“This emergency demonstrated to both me and the customer that SpeedHex® 3 is the most successful alternative to hex mesh in terms of quality, reliability, and super-fast installation. From now on, no one will worry about hex mesh failures,”

Mohamed Rashed, Business Development Manager IMEA

SILICON’s full-service solution is designed for such projects. With just one click, your project receives comprehensive engineering, production, and on-site installation. One click brings peace and order to the site.

We know how to handle any ad-hoc issues, as our Rapid Arc Welding technology is your reliable back-up, making the installation process seamless and worry-free.

Want an awesome project like this?

At this jobsite

  • Anchors/solution: SpeedHex® 3, SpeedHex® Mini, SpeedTab®
  • Areas: Regenerator Primary Cyclones Roof Sections, Regenerator Secondary Cyclones, Reactor Slip Joint Outer Diameter
  • Installation Time: 21 June 2022 – 1 July 2022 (11 days)
  • 25 Crew Members: 1 Project Manager, 1 Senior Supervisor, 5 Supervisors, 16 Operators, 2 Administrators
  • Machines: 10xD20
  • Scope of work: Area 100 m2, 89500 SpeedHex® 3 were installed

Photo gallery